Friday, March 30, 2012

Meyer Werft Readies AIDAmar for Float Out

AIDAmar is shown in these photos inside the covered building dock yesterday at Meyer Werft in Papenburg (Germany). The ship will be floated out for testing and docking at the outdoor finishing dock on April 1, 2012.

The ship is shown resting on blocks in the the drydock. It is being flooded today in anticipation of Sunday's operation. In the second photo, note the tug boat sitting on the floor of the dry dock already in position to assist in guiding the ship's bow during the float out.




Photos courtesy of Meyer Werft