Friday, July 7, 2017

Carnival Vista 3 Work Underway

Fincantieri began work today at their Marghera yard on hull #6272, by cutting the first steel for the ship.

The sheet metal will then be assembled into blocks and those blocks will then be assembled in the dry dock into Carnival's third Vista-class ship, which at this point, is still unnamed.

Details appeared in the July 7 edition of Cruise News Daily.

The plasma torch in the background cutting the sheet metal is cutting the first steel for Carnival Vista 3.
Photo courtesy of Fincantieri. All rights reserved. May not be copied or used without express permission.