Thruster and stabilizer tests will be performed in the lagoon the following day. The ship will remain at Meyer's pier for final outfitting until its conveyance down the Ems River in mid-September.
Quantum of the Seas ready for float out |
Photo courtesy of Meyer Werft. All rights reserved. May not be copied or used without permission.