Tuesday, September 6, 2011

STX Floats out MSC Divina

The construction phase of the building of MSC Divina ended on Saturday (September 3, 2011) when it was floated out of the building dock at the STX France yard in Saint Nazaire.



The ship was towed to a finishing dock at the facility where interior work will continue until it is delivered in May 2012.



The ship is the third in the 140,000-ton Fantasia class, but contains 100 additional staterooms and some new design elements.